Provision of Slope Protection Along Cahayag (Tubigon) – Causwagan Sur (San Isidro) Road – Horizontal (Tubigon – San isidro), Bohol
Delivery Period: 30 Days
Place of Delivery: To the Various Offices / End-user
To be awarded by Line Item
Pre-Bid Conference on July 10, 2024 at the BAC Office Conference Room, PPMU Office