Solicitation Number:2025-000318Trade Agreement:Implementing Rules and RegulationsProcurement Mode:Negotiated Procurement – Small Value Procurement (Sec. 53.9)Classification:GoodsCategory:Construction Materials and SuppliesApproved Budget for the Contract:PHP 438,208.00Delivery Period:30 Day/sClient Agency:Contact Person:Alvin Antopina
PhilGEPS In-charge
New Capitol Complex,
Tagbilaran City
Bohol
Philippines 6300
63-411-0138 Ext.038

ppmubohol@gmail.com
StatusActive
Associated Components1
Bid Supplements0
Document Request List0
Date Published27/02/2025
Last Updated / Time27/02/2025 12:00 AM
Closing Date / Time03/03/2025 10:30 AM
Description 1 FDT Apparatus – Consists of: 1 – Cone and density plate1 – Density plastic jugLaboratory Equipment for materials testing 4 set
2 Laboratory Oven – Digital PID temperature control systemHigh temperature uniform & precisionStainless steel internal & external lining “linen” patterned Forced convection airflow200°C maximum temperatureSupplied complete three grid shelves 230V, 50-60Hz250 liters normal capacity 1 unit
3 Liquid Limit Device – Manual operated with grooving tool, With ebonite base and removable brass cup.The height of drop of the cup maybe adjusted via the hand crank mechanism. A built-in blowencounter is supplied as standard.Dimensions (mm): 150 x 150 x 120 (h) 3 unit
4 Moisture Meter Protimeter – Speedy Standard for laboratory materials testing 2 unit
5 Slump Test Equipment – Complete set which includes:Cone made from galvanized sheet steel.Dimensions (mm): 360 x 200 x 300 (h) ; Weight: 2kg.Steel tamping rod, dia. (mm): 16 x 600 (l) 4 unit

Date of delivery: 30 days upon receipt of NTP.