Solicitation Number:2025-000447Trade Agreement:Implementing Rules and RegulationsProcurement Mode:Negotiated Procurement – Small Value Procurement (Sec. 53.9)Classification:GoodsCategory:Airconditioning and Airconditioning SystemsApproved Budget for the Contract:PHP 398,877.00Delivery Period:30 Day/sClient Agency:Contact Person:Joseph M. Erecre – f Secretariat New Capitol Compound Tagbilaran City Bohol Philippines 6300 63-038-4110138 Ext.4212 ppmubohol@gmail.com | Status | Closed |
Associated Components | 1 | |
Bid Supplements | 2 | |
Document Request List | 3 | |
Date Published | 06/05/2025 | |
Last Updated / Time | 19/05/2025 12:29 PM | |
Closing Date / Time | 23/05/2025 10:30 AM | |
Description ANNUAL PROCUREMENT PLAN (QUARTERLY) City of Tagbilaran FOR THE YEAR 2025 – Quarter : 2 AIR CONDITIONING EQUIPMENT AND SUPPLIES Province, City or Municipality: Provincial Government of Bohol Item No: Particulars Qty Unit Total Cost Department / Office : All (Consolidated) Regular Constingency Date Submitted : Total 398,877.00 ALTERNATIVE MODE – NEGOTIATED PROCUREMENT – SMALL VALUE PROCUREMENT Mode of Procurement: Plan Control No. 2025-000447 Planned Amount 398,877.00 PROVINCIAL GOVERNMENT OF BOHOL 2025-000447 Lot No. Air Conditioning Sets/Units 1 1 Unit 1.5HP Wall Mounted Inverter Type with Wireless Remote Controller, 230V/1Ph/60Hz – Installation of 1.5HP Wall Mounted Inverter Type within 10ft Copper Piping complete with Rubber Insulation & Communication Wirings. Excess Piping Complete with Rubber Insulation & Communication wirings of 1.5HP Wall Mounted Inverter Type Airconditioner. SCOPE OF WORK TO BE DONE: 1.0 Supply & Installation of Air condition Bracket/Hangers & Supports, 2.0 Supply & Installation of Rubber Insulation, 3.0 Supply & Installation of Polyethylene Tape, 4.0 Supply & Installation of Condensate Drain Piping System Using PVC pipe 20mm dia, 5.0 Supply & Installation of Refrigerant Piping System Using Copper Tupe, Elbows & Couplings, 6.0 Supply & Installation of Piping Hangers/Clips, 7.0 Electrical Installation from Indoor to Outdoor Unit Only, 8.0 Flushing the System with Nitrogen Gas, 9.0 Leak Testing, 10.0 Welding Works, 11.0 Dehydration of Cooling System, 12.0 Recharging of Freon, 13.0 Pipping minimum allowed within 10ft., Excess of Pipping charge 500.00/ft. 1 1 Unit Air Conditioning Unit with Piping System and Installation – Wall Mounted, 2.5HP, with Econo Mode, Gin Ion Filter, Super Printed Circuit Board (PCB), 230V/1ph/60hz, 1 pc of Service Circuit Breaker 30A 1ph, 4m of #10 AWG THHN, 5m of Royal Cord 4 x #14, 1 length of PVC Pipe blue 3/4″, 4 pc of PVC Elbow, 3/4″, 6 set of Expansion Shield with lag Screw, 1 pc of silver rod, 4 pcs of Bolts nuts and washer, Angular Bar 1 1,2″ x 1 1/2″ x 3×16″ x 20′ (outdoor), 15ft of 1/4″ dia refrigerant pipe(soft drawn), 15ft of 1/2″ dia Refrigerant pipe(soft drawn), 3 lengths of 1/4″ x 1/2″ x 6′ rubber insulation, 3 lengths of 1/4″ x 1/2″ x 6′ rubber insulation, 0.4 roll of Polyethylene Tape, 0.5 tank of Nitrogen, 0.5 tank of Mapp Gas, 0.4 tank of Refrigerant, with Compressor warranty of 5 yrs and 1 yr for other parts 2 PGBh-US Procurement 1 Unit Floor Mounted Inverter Air Conditioning Unit with Complete Installation – Supply and installation of floor mounted inverter air conditioning unit with complete installation materials Sky air standard inverter floor mounted with wireless remote controller 5.0TR/6.0 HP, equipped with long life filter, vertical auto swing (up& down, left and right), high efficiency fan DC fan motor, high EER (2.57 watt/watt), 14.okw capacity, capacity range: 21,200 to 52,900 Btu/hr., running current: 23.8A, power consumption: 5,450 watts, refrigerant used: R32, Model FVFC140BXVA/RZFC140BXVM, Power Supply: 23ov, 1ph, 60hz, 1 year warranty for parts 5 years warranty for compressor 3 years warranty for outdoor PCB 3 Lot/SubCategory Total : 395,107.00 Lot No. Air Conditioning Supplies and Spare Parts 2 1 Refrigerant – R32a 2 piece Lot/ SubCategory Total : 3,770.00 This is to certify that the above annual procurement plan is in accordance with the objectives of this office/agency Prepared by: PAULITO H. RABUYA Head, BAC Secretariat Printed by : 2345 on 5/5/2025 9:03:37 AM 2025-000447 Period of Delivery: 30 days Reference Number 12010206 Title 2025-000447 PROCUREMENT OF AIR CONDITIONING EQUIPMENT AND SUPPLIES Category Airconditioning and Airconditioning Systems Type Addendum Bid Supplement No. 12010206-01 Title Extension of Advertisement Closing Date/Time 19/05/2025, 10:30AM Remarks Extension of Closing Date Reference Number 12010206 Title 2025-000447 PROCUREMENT OF AIR CONDITIONING EQUIPMENT AND SUPPLIES Category Airconditioning and Airconditioning Systems Type Addendum Bid Supplement No. 12010206-02 Title Extension of Advertisement Closing Date/Time 23/05/2025, 10:30AM Remarks Extension of Advertisement |